EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
NewtonRV-14A
-
Listing for Category : 23:aileron act.
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (478)
Research
Workshop
- (3)
Empennage
- (8)
6: Vert Stab
- (8)
7: Rudder
- (27)
8: HorizStab
- (15)
9: Elevator
- (42)
10:Rear Fuselage
11:Emp Attach
12: Emp Fairings
Wings
- (12)
13:Main WingSpar
- (14)
14: Wing Ribs
- (18)
15:Rear WingSpar
- (12)
16:Top Wing Skin
- (27)
17:Outbd LdgEdge
- (34)
18:Fuel Tank
- (60)
19:Wing Sys Rtg
- (9)
20:Bot Wing Skin
- (41)
21: Flap
- (22)
22:Aileron
- (20)
23:Aileron Act.
- (8)
24:Wing Tip
- (2)
38:Roll Trim
- (2)
57:AP Servos
- (3)
Fuselage
- (6)
Finishing Ki
- (1)
Firewall
Controls
Avionics
- (4)
Lighting
Instrument Panel
Landing Gear
Engine
- (1)
Propeller
- (2)
Fuel System
Interior Finish
Paint / Decals
- (4)
Inspection
Tools
- (26)
Records
- (3)
Auto Entry
Supplies
- (6)
-
Ordered pro seal and...
-
Ordered Double SIded...
-
Tools: Cleaveland...
-
Vans: Tank Sealant,...
-
Cleaveland Tool:...
-
Cleaveland: 1"...
Insurance
- (2)
Builder Name:
Dustin Newton
-
Project:
Vans - RV-14A
Total Hours:
1178.7
Total Flight Time:
Start/Last Date:
Apr 09, 2021 - No Finish Date
Engine:
Lycoming IO-390-119EXP
Propeller:
TBD
Panel:
AFS/Dynon/Avidyne
Friendly URL:
https://eaabuilderslog.org?s=NewtonRV-14A
Home or Last Project Picture
Jun 16, 2023
Aileron Act.: Finish connecting and adjusting main push/pull tubes
- (2.3 hours)
Category: 23:Aileron Act.
This procedure entailed using a "neutral" template and measuring to make sure the length of the main push/pull tube is correct. Through adjustments I was able to adjust it to +/- 1mm.
Jun 11, 2023
Aileron Act.: rivet push/pull tubes, begin fitting right wing actuation assy
- (2.4 hours)
Category: 23:Aileron Act.
Jun 10, 2023
Aileron Act: finish installing torque tube assy
- (2.3 hours)
Category: 23:Aileron Act.
IMG_3624.jpeg
Jun 03, 2023
Aileron Act: build aileron torque tube assemblies
- (5.6 hours)
Category: 23:Aileron Act.
Completed torque tube assemblies except for final washer and nuts. There is missing hardware that needed to be ordered to completed installation.
IMG_3613.jpeg
May 29, 2023
Aileron Act.: Begin building torque tubes
- (4.0 hours)
Category: 23:Aileron Act.
May 28, 2023
Aileron Act: Build aileron push rods
- (3.5 hours)
Category: 23:Aileron Act.
Was able to complete them except for final riveting. The rivets from Van's were incorrect so I ordered the right ones.
May 21, 2023
Aileron Act: Cut, Prep, and Prime Aileron Torque Tubes
- (3.0 hours)
Category: 23:Aileron Act.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.